An engineering, procurement and installation driven eresource Nfra ERP solution for EPC and MEP contractors
Fill out the form below to get in touch with us
Trusted by Industry Leaders
Service-wise installation progress, submittal and drawing approval cycles, long-lead deliveries against programme, SITC claims and retention — for every package, every floor, live.
Service Progress — Harbor Gate Tower
AzaaleaGPT — Progress Claim 11 (₹6.4Cr) ready: installed quantities certified for L1–L9 across four services — submit before the 25th cutoff. Chiller submittal CH-R2 with the consultant 12 days — chase now or the ETA advantage is lost. Fire-alarm cable delivery drifted 8 days past need date — second-fix front on L4 at risk; reallocation suggested.
An EPC or MEP package is won or lost off-site: in the submittal log where a drawing sits unapproved, in the long-lead order where a chiller misses its need date, and in the claim where installed work goes uncertified. Generic software sees none of it. eresource Nfra was built over 20+ years for exactly this: engineering, procurement and installation on one timeline, with supply-and-install billing that matches how the contract actually pays.
"MEP delay is rarely on the tools — it's a submittal with the consultant, a panel on a ship, a T&C window nobody protected. eresource Nfra puts all three on one screen before they become the programme's problem."
Why does 20+ years of EPC & MEP ERP experience across 25 countries matter?
A SITC claim that bills supply on delivery and installation on progress is not a sales invoice. A material submittal on revision 3 with the ball in the consultant's court is not a document — it's the critical path. Cable measured in metres, ducting in kg and sq.m, equipment by TR and kW — each billed differently. These are EPC and MEP realities, and eresource Nfra was built for them alongside project engineers and QS teams for over two decades.
India EPC & MEP compliance — pre-built
UAE / GCC compliance — pre-built
⚡ 8 EPC / MEP Package Stages
Not a generic project ERP. A dedicated EPC & MEP platform — with submittal registers, long-lead expediting, SITC billing and T&C workflows pre-configured for your package type.
Don't see your package type? We very likely serve it.
Talk to a ERP Specialist →From engineering and submittals through long-lead procurement, SITC progress claims and testing & commissioning — all in one integrated EPC & MEP ERP.
The package's critical path runs through the submittal log. Track every shop drawing and material submittal by revision and ball-in-court, and never let an unapproved document stall installation silently.
Chillers, panels, generators and pumps decide the programme. Procurement runs supply and install as one plan — with committed cost visible from PO day one and every delivery expedited against its need date.
Supply-and-install contracts pay two ways: supply on delivery, installation on progress. eresource Nfra bills both from one BOQ — with retention, advance recovery and the e-invoice generated in the same step.
The last 10% takes the blame for every delay before it. First and second fix tracked floor-wise, T&C protocols executed system-by-system, authority approvals sequenced, and the O&M dossier built as you go — not the week before handover.
Plus 8 more modules covering the full project lifecycle:
MEP work happens in risers, plant rooms and ceiling voids — not at desks. eresource Nfra Mobile puts every workflow at the workface: progress on the floor, submittal status in the pocket, T&C sign-offs at the panel.
🔧 Second Fix Logged 08:50
Electrical second fix complete L9–L11 · 1,840 points · HVAC flexible connections L8 done · Photos attached
📐 Submittal Approved 10:20
CH-R2 Chillers approved (Code A) after 12 days with consultant · PO released to supplier · ETA locked: 21 days
🚚 GRN 12:15
Cable drums 4 × 500m XLPE received · PO-2281 · e-Way Bill verified · Issued to L4 fire-alarm front
🧪 T&C Sign-Off 14:30
Pump set PS-2 pre-commissioning checks witnessed and signed · Test results uploaded to the O&M dossier
Measurable results from EPC and MEP contractors running eresource Nfra on live packages.
Tower MEP Package · Billing
Claim cycle cut by 30% with floor-wise installed measurement flowing straight into SITC progress claims with retention.
Plant EPC · Programme Control
Long-lead delays eliminated — zero equipment misses in a year with ETA-vs-need-date expediting and AzaaleaGPT submittal ageing alerts.
This EPC & MEP edition is built on eresource Nfra — the construction ERP developed over 20+ years, live with 600+ contractors across India, the UAE and 25+ countries. Submittals, long-lead procurement, SITC claims and T&C workflows come pre-configured.
From a single MEP package to a multi-project EPC portfolio, the same Nfra platform scales with you — with AzaaleaGPT AI watching submittals, deliveries and claims across it all.
Explore Nfra ERP →Five straight answers on submittals, long-lead procurement, SITC claims and T&C — from 20+ years of EPC & MEP ERP.
Still have questions? Talk to an EPC & MEP ERP specialist →EPC and MEP ERP manages the full package lifecycle — engineering and shop-drawing submittals, long-lead procurement and expediting, supply-and-install (SITC) progress claims with retention, testing and commissioning protocols and authority handover — in one platform. eresource Nfra is built on 20+ years of construction ERP experience with 600+ contractors across India, the UAE and 25+ countries.
Every submittal is registered by specification section with revision control, due dates and ball-in-court status — with the consultant, client or contractor. Ageing is flagged automatically, so a drawing sitting unapproved for 12 days gets chased before it stalls installation, and the log is always audit-ready.
Each BOQ item is billed the way the contract pays: supply on delivery, installation on measured progress — cable in metres, ducting in kg and sq.m, equipment by unit — certified floor-wise. Retention and advance recovery apply per contract, and the GST e-invoice (IRN) or FTA Fatoora is generated with the claim in one step.
Yes. Chillers, panels, generators and other critical equipment are tracked order-to-delivery — inspection, FAT, shipping, customs, site — with ETA compared to need date continuously. Committed cost counts against the package budget the day the PO is placed, so margin erosion shows up months before the invoice.
A package typically goes live in weeks — BOQs imported with supply/install splits, submittal registers set up from the spec, and teams onboarded from MEP engineer to QS to PM. A 30-day free trial is available, pre-configured with submittal, procurement, claim and T&C workflows; no credit card required.
⚡ EPC & MEP ERP · 20+ Years · 600+ Contractors
Transform your package delivery with a solution that understands submittals, long-lead procurement and SITC billing. Contact us for a demo and discover how eresource Nfra can help your company deliver every package smarter, faster, and more profitably.
Book a Demo →Related EPC, MEP & Construction ERP Pages
eresource Nfra is India and UAE's ERP for EPC and MEP projects — purpose-built over 20+ years for MEP contractors, EPC companies, HVAC, electrical, plumbing, fire-fighting, ELV/BMS, solar and industrial process packages. Shop drawing and material submittals with ball-in-court tracking, long-lead procurement and expediting with committed cost, supply-and-install (SITC) progress claims with retention, testing & commissioning protocols, authority approvals and O&M handover — engineering to DLP on one platform, with India (GST e-invoice IRN · TDS 194C · e-Way Bill) and UAE (WPS · EOSB · FTA Fatoora · VAT 5%) compliance. 25+ countries. 600+ contractors live. Book a free demo with our EPC & MEP ERP specialist team today.
Request Demo Access
Fill in your details
Kindly Submit your details to get the Catalogue
Get a free ERP Readiness Assessment
No spam. Just valuable insights to help you choose the right ERP.