A package and chainage driven eresource Nfra ERP solution for metro rail, railway and mass transit infrastructure contractors
Fill out the form below to get in touch with us
Trusted by Industry Leaders
Package-wise progress by chainage, IPC certification, price escalation, plant utilisation and hindrances — for every corridor, every span, every station, live.
Package Progress
AzaaleaGPT — IPC-14 (₹28.6Cr) ready: certified quantities entered for Spans 180–214 — submit before the 25th cutoff. June WPI published: escalation claim ₹1.9Cr computable on steel and cement components — include in IPC-14. RoW hindrance at Spans 218–220 now 12 days — EOT register updated with photo evidence.
Every generic ERP measures a project as one lump. Metro and railway work is measured in chainage — piling per pile, piers per pier, viaduct per span, tunnel per ring, track per track-km, OHE per mast — across separately awarded packages, each with its own BOQ, its own IPC cycle and its own price-variation clause. eresource Nfra was built over 20+ years for exactly this: package-wise, chainage-wise measurement feeding WPI/CPI-linked escalation billing automatically.
"A metro corridor is five construction industries stacked on one alignment — civil, track, electrification, signalling and stations — each measured differently, each billed differently, all against one programme. eresource Nfra is the only ERP we found that treats it that way."
Why does 20+ years of infrastructure ERP experience across 25 countries matter?
An IPC with mobilization advance recovery, retention, and a WPI-indexed price-variation annexure in the client's prescribed format is not a sales invoice. A launching girder whose erection cycle drives the viaduct programme is not a stock item. A Right-of-Way hindrance that must be evidenced day-by-day for an EOT claim is not a project note. These are metro and railway realities — and eresource Nfra was built for them by people who have worked alongside infrastructure QS teams, planning engineers and project accountants for over two decades.
India metro & rail compliance — pre-built
UAE / GCC compliance — pre-built
🛤️ 8 Metro & Rail Work Packages
Not a generic project ERP. A dedicated infrastructure platform — with every package measured by chainage, every IPC escalation-indexed, and every plant asset tracked from erection cycle to demobilisation, pre-configured for your package type.
Don't see your package type? We very likely serve it.
Talk to ERP Specialist →From package award and chainage-wise BOQ through IPC billing with price escalation, heavy plant management, hindrance and EOT records and package P&L — all in one integrated infrastructure ERP.
Track tenders, manage documentation, and submit bids faster with structured workflows.
Control project costs from the bidding stage itself.
Plan every phase of the project with precision.
Stay within budget and avoid cost overruns.
Plus 5 more Nfra modules — part of 70+ across the eresource ecosystem:
A metro package runs along kilometres of alignment — the system has to travel with the team. eresource Nfra Mobile puts every critical workflow at the chainage where it happens: on the deck, in the tunnel, at the casting yard.
🌉 Span Erected 07:30
Span 214 erected by LG-2 · 28th span this month · Cycle time: 3.1 days · Next: Span 215 segments at yard
⚠ Hindrance 09:10
RoW not handed over Spans 218–220 · Day 12 · Photo + letter ref logged · EOT register updated
🏛️ Station Pour 11:45
STN-09 concourse slab: 640 cu.m poured · Batching plant BP-1 · Cube samples tagged · NCR: none
👷 Attendance 13:00
Today: 412 workers across 6 fronts · BOCW register updated · Night shift roster confirmed for track work
Measurable results from interior fit-out firms running eresource Nfra on live projects.
Fit-Out · Design Control
Rework reduced by 22% through integrated design control and quality management workflows.
Retail · Multi-Store Rollout
On-time opening of 12 stores achieved through synchronized project execution and real-time tracking.
This metro & railway edition is built on eresource Nfra — the construction and infrastructure ERP platform developed over 20+ years and running on 500+ project sites across India, the UAE and 25+ countries. Chainage-wise BOQ and measurement, IPC billing with WPI/CPI price escalation, launcher and TBM plant control, hindrance and EOT records, gang labour with BOCW compliance and package-wise P&L come pre-configured for mass transit and railway work.
Whether you deliver elevated viaducts, underground TBM drives, station buildings, track and P-way, OHE and traction or signalling packages, the same Nfra platform scales from a single package JV to a multi-corridor portfolio — with AzaaleaGPT AI watching IPC readiness, escalation claims and plant utilisation across all of it.
Explore Nfra ERP →Nine straight answers on chainage BOQs, IPC escalation, launcher & TBM plant, hindrance/EOT and compliance — from 20+ years of infrastructure ERP.
Still have questions? Talk to a metro & rail ERP specialist →Metro and railway ERP manages package-based infrastructure delivery — chainage-wise BOQ and measurement, IPC billing with price escalation, heavy plant like launchers and TBMs, hindrance and EOT records, gang labour and statutory compliance — in one platform. eresource Nfra is built on 20+ years of infrastructure ERP experience across India, the UAE and 25+ countries.
Work is measured where it happens: piling per pile, viaduct per span, tunnel per ring, track per track-km, OHE per mast. Joint measurements are recorded on site against the package BOQ with photo evidence, and roll up into the client's prescribed measurement formats — so IPC quantities are certified from records, not reconstructed from spreadsheets.
Yes. The escalation engine applies WPI/CPI indices component-wise — steel, cement, labour, fuel — exactly per the contract's price-variation clause, and computes the escalation amount into each IPC. When new indices are published, AzaaleaGPT flags the claimable amount so no escalation is left unbilled.
Certified quantities generate the Interim Payment Certificate with measurement abstract, mobilization advance recovery, retention deduction and the escalation annexure — in DMRC/RVNL-style prescribed formats. The GST e-invoice with IRN (India) or FTA Fatoora e-invoice (UAE) is generated with the IPC in one step.
Yes — by the cycles that drive the programme: spans per month per launching girder, rings per day per TBM, output per batching plant. Utilisation hours, idle time, breakdowns, fuel and maintenance are logged from mobile; hired plant is verified against hire invoices with TDS 194I deducted (India); AzaaleaGPT flags idle plant while costs run.
🚇 Metro & Railway ERP · 20+ Years · 25+ Countries
Transform your corridor delivery with a solution that understands chainage-wise measurement, IPC billing with price escalation, and heavy plant like launchers and TBMs. Contact us for a demo and discover how eresource Nfra can help your company deliver every package smarter, faster, and more profitably.
Book a Demo →Related Infrastructure & Construction ERP Pages
eresource Nfra is India and UAE's ERP for metro and railway projects — purpose-built over 20+ years for metro rail contractors, elevated viaduct packages, underground and TBM tunnelling, station buildings, track and P-way, OHE and traction, signalling and depot works. Chainage-wise BOQ and measurement (spans · rings · track-km · masts), IPC billing with WPI/CPI price escalation, launcher and TBM plant control, hindrance and EOT records, BOCW-compliant gang labour, and India (GST e-invoice IRN · TDS 194C · e-Way Bill) and UAE (WPS · EOSB · FTA Fatoora · VAT 5%) compliance. 25+ countries. 500+ project sites live. Book a free demo with our infrastructure ERP specialist team today.
Request Demo Access
Fill in your details
Kindly Submit your details to get the Catalogue
Get a free ERP Readiness Assessment
No spam. Just valuable insights to help you choose the right ERP.